You don't see a work man for weeks, then they all decend at once! At the moment, at every turn in Wake Green Park you will see a hi-viz jacket.

First up. New garages.

Court 1 garages are being fitted with new doors and roofs. The infrastructure was crumbling, so they are having a make over.

As for the other garage blocks, as it stands at the moment, Court 2 and 3 are in good nick, and Court 4 may have some work done at some point when it's required.




You may have seen some heavy duty lorries coming in and out of the park, and heard the rumbles of road works and drilling coming from Michael Blanning House. There are new car park spaces being added into the M.Blanning car park.

These new spaces are not for Wake Green Park residents to use, but the hope is that the M.Blanning car owners can use up the spaces in their new car park which will alleviate the over spill of parked cars in WGP, thus leaving more car parking spaces for WGP residents.

ALSO

Wake Green Road is being re-surfaced at the moment. During the night! They seem to be closing the road in the early evening until about 6am. I hope WGP residents aren't losing too much sleep!